Back to overview
PORR Group

SlabTrackAustria continues to develop - a showcase project for energy-efficient construction according to Lean principles

/ PORR Group / News / Press Release

As part of the major S21 project in Stuttgart, the PORR Group is not only supplying 34km of state-of-the-art slab track and two points in the tunnel, but is also expanding its portfolio for Deutsche Bahn by supplying the electrical equipment.

PORR Deutschland Stuttgart 21 Stuttgart Slab Track Austria im Einsatz

In the course of realising the slab track, construction machinery with diesel drive was replaced by equipment with electric power, thus reducing the impact on the environment. Over 9 km of dead-end tracks were laid seamlessly alongside the structural and electrical work, both with and without pre-assembled long rails - the system's first and revolutionary approach.

Through technical adaptability and innovative logistics solutions, we have already completed 90% of the track construction work, prioritising safety in all areas of our work.

Scheduled for completion in 2024, the project will represent a significant milestone in terms of innovation in construction.

If you have any questions, please contact:

Sarah Render

Unternehmenskommunikation / Deutschland
+49 89 71001-475
presse@porr.de