A mixed-use residential and commercial development comprising 45 rental flats and twelve office units has been built at Rosenthaler Straße 43–45 in Berlin-Mitte. The new development comprises three buildings as well as commercial premises on the ground floor. PORR Spezialtiefbau Planung drew up the detailed design for the excavation works and the associated special civil engineering works.

 View of the reinforcement in the 3D model of the construction pit
© PORR

Facts & Figures


Company

PORR Spezialtiefbau Planung GmbH

Type

Planning

Runtime

11.2018 - 02.2020

Principal
PORR Spezialtiefbau GmbH

Planning an inner-city construction pit for residential and commercial buildings in Berlin-Mitte

Residential and commercial development in Berlin-Mitte

Planning permission for the construction pits had already been granted for the construction project. As part of the further planning, the construction pits and the specialist civil engineering elements were worked out in detail and adapted to the project’s constraints. The services included the design of the construction pit shoring, the anchors, the underpinning as well as the waterproofing of the structure against groundwater.

Excavation enclosure using several specialist civil engineering methods

The excavation structure combines various specialist civil engineering methods. Free-standing soldier pile shoring was specified in areas as well as along the street frontage without immediate neighbouring buildings. In the deeper sections, stability is provided by cast-in-situ slotted walls, which are temporarily supported by anchors or corner bracing.

DSV underpinning and DSV sealing slabs

In the area adjacent to Building No. 46, an anchored DSV underpinning was planned. DSV sealing slabs were also provided to seal the construction pit against the surrounding groundwater. The sealing slabs form an integral part of the construction pit’s waterproofing concept.

Micro piles to counteract uplift

Micro piles were planned in sections of the future buildings to counteract uplift. These foundation elements serve to absorb uplift forces and complement the project’s construction pits and foundation concept.

Design of shoring and foundation elements

The design services comprised the development and design of various specialist civil engineering works. These included: The individual systems were tailored to the structure’s geometry as well as the constraints of the inner-city location.

  • Soldier pile shoring walls
  • In-situ concrete diaphragm walls
  • DSV sealing slabs
  • DSV underpinning
  • Micro piles to counteract buoyancy
  • Steel bracing and anchors

Foundation for the implementation of the new-build project

The design of the excavation enclosure, the DSV measures and the foundation elements laid the groundwork for the construction of the residential and commercial building on Rosenthaler Straße. The design services formed the basis for the subsequent execution of the specialised civil engineering works.

What ultimately counts in the construction business is successfully completed projects. PORR has many of these.