Hamm, Germany / 10.2023 - 12.2024

The western section of the Datteln-Hamm Canal is being widened and deepened. In construction lot 6 West, the existing embankment wall and the old slope are being replaced by a set-back and anchored sheet-pile embankment. The Düsseldorf branch of PORR Spezialtiefbau is responsible for securing the sheet pile walls with permanent wire rope anchors on behalf of the consortium carrying out the works.

Picture shows a drilling excavator from the specialised civil engineering department working on the canal
© PORR

Facts & Figures


Company

PORR Spezialtiefbau GmbH

Type

Rehabilitation

Runtime

10.2023 - 12.2024

Principal
ARGE Ausbau DHK Los 6 West (Bauherr: WSV / WNA Datteln)

The Datteln-Hamm Canal is to get new embankments

Upgrading for larger vessels

The Datteln-Hamm Canal links the eastern Ruhr region with the West German canal network. The western section between the junction with the Dortmund-Ems Canal in Datteln and Hamm town harbour is being upgraded so that it can be navigated by large motor cargo vessels as well as by pushed convoys up to 186.5 metres in length. The entire route is divided into 18 upgrade lots for this purpose.

Lot 6 West comprises a section approximately 1.1 kilometres long in the city and harbour area of Hamm. In addition to renewing the bank reinforcement, the canal bed will be dredged and stabilised to achieve the required water depth. An enlarged turning area for vessels is also being constructed on the south bank.

Back-anchoring in variable subsoil conditions

The subsoil consists of gravelly-silty sands of varying thickness, overlying clay marl. Permanent strand anchors, which can be adapted to the varying subsoil conditions, are being used to back-anchor the sheet pile walls. On the north bank, 421 anchors with lengths of up to 30.5 metres are being installed, whilst on the south bank a further 125 anchors with lengths of up to 26 metres are being installed.

Drilling in confined spaces and from the water

On the north bank, an earth embankment limits the available working space. A large proportion of the anchor drilling is therefore being carried out underground using a drilling dredger. On the south bank, the anchors are being installed using a standard anchor drilling rig, partly from the bank and partly from a floating pontoon.

More space for shipping in Hamm

The expansion will create the conditions in the city and port area of Hamm for larger vessels to navigate the waterway. The larger turning area and the required water depth will expand the spatial possibilities for shipping traffic on this section of the canal.