‘Smith Barracks’ accommodation block

Baumholder, Germany / 12.2024 - 01.2026

PORR Government Services has carried out a comprehensive refurbishment of a residential block at Smith Barracks in Baumholder. Commissioned by the US Army Corps of Engineers, the project involved the creation of 30 modern flats with redesigned living areas and state-of-the-art building and security systems. The existing building was adapted to meet American and German housing standards as well as the specified security requirements.

The image shows the façade of Smith Barracks in Baumholder. A PORR container can be seen at the rear right.
© PORR

Facts & Figures


Company

PORR Government Services GmbH

Type

Building service

Runtime

12.2024 - 01.2026

Principal
US Army Corps of Engineers

A new standard of living at the Smith Barracks

Existing properties transformed into modern living spaces

The rehabilitation ran from November 2023 to December 2025 and was completed on schedule and within budget after approximately two years of runtime. The existing flats were functional but offered potential for a more contemporary design. A new layout adapted the existing building structure to the requirements of its future use.

More spacious apartments

The new layout has created bright, spacious rooms with space for walk-in wardrobes, modern bathrooms and fitted kitchens. As a result, the 30 apartments now feature clearly defined living and functional areas. A humidity-controlled exhaust air system helps to ensure a pleasant living environment.

Space for socialising and working

On each floor, communal kitchens and lounges complement the private flats. Additional office space and storage space have also been created in the attic. The layout thus takes into account not only residential needs but also communal and functional areas.

An existing building with character

During the modernisation, elements of the original building were also preserved. The original tiles in the corridors have been retained, continuing the character typical of barracks found in the existing structure. The rehabilitation thus combines the new interior design with a visible part of the existing building fabric.

Security as part of the rehabilitation

In addition to the requirements for quality of living, comprehensive security specifications had to be taken into account. The flats are equipped with an access control system as well as a fire detection and voice alarm system. These are complemented by bullet-resistant windows and doors in accordance with AT/FP specifications.

New ceiling creates space for fire-suppression equipment

The installation of the sprinkler system with its fire-water tank presented a particular structural challenge. To create the necessary space, the vaulted ceiling above the basement was replaced by a reinforced concrete slab covering an area of 60 square metres. The concrete was poured in sections to ensure the stability of the external walls during construction.

District heating supply remains operational

Another challenge was the existing district heating pressure-maintaining system. It had to remain operational throughout the entire runtime, as it supplies heat to the surrounding buildings. Accordingly, the system was given special protection during the works to ensure that the heat supply was not interrupted.

A new standard of living for the soldiers

Following the rehabilitation, 30 newly designed flats are now available at Smith Barracks in Baumholder for the soldiers stationed there. Private living areas as well as communal spaces create a modern living environment within the existing accommodation block.

What ultimately counts in the construction business is successfully completed projects. PORR has many of these.