SWW OberallgĂ€u is constructing two blocks of flats in Immenstadt in the AllgĂ€u region. On behalf of Geiger SchlĂŒsselfertigbau, PORR special civil engineering SĂŒd carried out the foundation work using Atlas full-displacement piles. PORR special civil engineering Planung also helped to develop the foundation concept for the project.

Facts & Figures


Company

PORR Spezialtiefbau GmbH

Type

Subsoil improvement

Runtime

04.2025 - 05.2025

Principal
Geiger SchlĂŒsselfertigbau GmbH & Co. KG

Atlas full-displacement piles for a housing development in Immenstadt

Alternative to the bored piles originally planned

Atlas full-displacement piles were used for the foundations instead of the bored piles originally specified in the tender. They require less penetration into the load-bearing subsoil than the solution originally envisaged. During installation, the soil is completely displaced, meaning that no drill cuttings are produced during the construction of the piles which would subsequently need to be disposed of.

Quiet and vibration-free

The method used enables the piles to be installed quietly and without vibrations. The Atlas full-displacement piles could therefore be constructed whilst taking the neighbouring area into account. At the same time, the deep foundations can be carried out relatively quickly using the chosen method.

94 piles up to 16 metres in length

PORR special civil engineering installed a total of 94 atlas piles for the two blocks of flats. The piles have a diameter of 46/56 cm and reach lengths of up to 16 metres. This provided the necessary deep foundations for the buildings.

Varying subsoil conditions

The subsoil, which had low bearing capacity and was prone to settlement, presented a particular challenge. Even within a small area, subsoil conditions varied considerably. Consequently, the plans had to be adjusted at short notice during the works.

Pile diameters adjusted at short notice

To ensure the stability and load-bearing capacity of the foundations, the pile diameters were redesigned to use EA piles. Within two working days, the team switched to a larger cutting head, thereby increasing the pile cross-section whilst maintaining the same pile lengths. In this way, the required load transfer could be ensured without affecting the construction schedule.

More housing in Immenstadt

The two blocks of flats are creating additional housing in Immenstadt in the AllgÀu region. In doing so, the special civil engineering firm laid the foundations for new local housing.