On Cora-Berliner-Straße in Berlin, the Palais an den Ministergärten – a mixed-use residential and commercial development – was built in the immediate vicinity of Potsdamer Platz. For this construction project, PORR special civil engineering was commissioned to excavate a construction pit up to 9.5 metres deep, including waterproofing and shoring works.
Facts & Figures
Company
PORR Spezialtiefbau GmbH
Type
Turnkey construction pits, Sealing slabs
Runtime
01.2019 - 12.2020
Turnkey construction pit in a city centre location
To secure the excavation pit, in-situ concrete diaphragm walls were constructed with single-layer rear anchoring using strand anchors. The design provided for horizontal waterproofing over the marl layer present in the subsoil, which, with thicknesses of up to 2.0 m, was to be used as a natural water-retaining layer. To increase the reliability of the works, the construction pit was additionally divided into three sub-construction pits by means of waterproof bulkheads. This allowed individual areas to be worked on independently of one another.
Remains of air-raid shelters in the subsoil
The subsoil survey had already documented the remains of historic air-raid shelters as potential obstacles. These structural remains were exposed and removed during the preparatory work by means of overlapping large-diameter boreholes measuring 880 mm in diameter. During the earthworks, a further air-raid shelter, which had not previously been documented, was also discovered. Following a heritage assessment, this was also dismantled. The area remaining outside the construction pit was subsequently backfilled with liquid soil.
Additional DSV base for construction pit waterproofing
During the diaphragm wall works, it became apparent that the natural marl layer was not present throughout certain areas or was not found in the form originally assumed. Furthermore, natural obstacles were identified on the water-retaining layer. This necessitated additional waterproofing measures. Supplementary waterproofing bulkheads as well as approximately 600 m² of additional DSV base were constructed for the construction pit using the jet grouting method. These measures complemented the construction pit’s waterproofing concept and were adapted to the actual ground conditions encountered.
Diaphragm walls, anchors and DSV from a single source
The combination of in-situ concrete diaphragm walls, strand anchors, sealing bulkheads and a DSV base formed the shoring and waterproofing system for the construction pit. The work was carried out in accordance with the geotechnical constraints and the project’s inner-city location.
The foundation for the new Palais an den Ministergärten
The excavation of the construction pit laid the groundwork for the construction of the mixed-use residential and commercial building. The diaphragm walls, anchors and DSV works formed the basis for the subsequent structural works at the Berlin-Mitte site.
Further Facts
Palais an den Ministergärten
- Floor area
- 4.100 m2
- Diaphragm wall volume
- 4.750 m2
- SW dimensions
- d = 600 mm / bis 17 m deep
- Jet Grouting
- up to 12 m