Donauwörth
Railway station
Donauwörth, Germany / 06.2020 - 03.2022
As part of the work to make Donauwörth railway station accessible, a new pedestrian tunnel with lift facilities was constructed beneath the tracks. To build the tunnel, a sheet-pile caisson as well as temporary railway overpasses were first erected. PORR special civil engineering was commissioned to construct the DSV sealing slabs.
Facts & Figures
Company
PORR Spezialtiefbau GmbH
Type
Sealing slabs
Runtime
06.2020 - 03.2022
DSV sealing slabs for the station’s accessibility improvements
Sealing slabs for tunnelling in groundwater-affected conditions
As the groundwater was located in the area of the planned excavation floor, it was necessary to construct DSV sealing slabs within the existing sheet-pile caisson. The sealing slabs were constructed using the jet grouting method and form the foundation for the construction pit of the new pedestrian tunnel. In the areas where the lifts were to be installed, the DSV sealing slabs were additionally back-anchored using GEWI piles.
Construction under restricted headroom
A key constraint of the project was the limited working height beneath the existing railway viaducts. The jet grouting works therefore had to be adapted to the available space. Furthermore, there was no space available within the construction site for earth basins or larger collection systems. To divert the jet grouting effluent, return pipes up to 200 m in length were therefore laid. The material was transported using compressed air to an earth basin located outside the construction site.
Special civil engineering beneath railway infrastructure
The DSV sealing slabs were constructed in an area of active railway infrastructure. Owing to the local conditions, individual drilling rigs had to be transported into the work area via goods wagons. The selection of the equipment used took into account the available space as well as the requirements of the DSV works within the sheet pile box.
DSV underpinning of an existing building
In addition to the construction of the sealing slabs, an adjacent existing building was underpinned using DSV columns. The underpinning formed part of the structural stabilisation measures during the subsequent construction works and was adapted to the local conditions.
The basis for the barrier-free station expansion
The construction of the DSV sealing slabs, the back-anchoring using GEWI piles as well as the underpinning of the existing building created the conditions necessary for the construction of the new pedestrian tunnel and lift systems. The specialised civil engineering works thus formed an essential basis for the barrier-free expansion of Donauwörth station.