Leipzig
Alte Messe
Leipzig, Germany / 04.2025 - 09.2025
On the site of the Alte Messe Leipzig, the listed Exhibition Hall 12 is being gradually converted into a new office, archive and innovation centre. With the third construction phase, the development of the approximately 200-metre-long building complex is entering its final stage. For the special civil engineering works, PORR Spezialtiefbau Region Ost, in collaboration with S&S Baugesellschaft, was awarded the contract to excavate and stabilise the construction pit. The works are being carried out within a historic site, the defining structural elements of which will be preserved for the future. Even before the new facilities are occupied, the foundations for the subsequent construction phases are being laid beneath the surface of the site.
Facts & Figures
Company
PORR Spezialtiefbau GmbH
Type
Turnkey construction pits
Runtime
04.2025 - 09.2025
Special civil engineering with a delicate touch
A historic exhibition hall undergoing transformation
Exhibition Hall 12 is one of the most striking buildings at the Alte Messe Leipzig. Alongside the Double M Gate, the golden spire with the red star defines the appearance of the former exhibition grounds. As part of the redevelopment, part of the historic load-bearing structure will be preserved. In accordance with heritage conservation requirements, the northern and southern porticoes, as well as eight frames of the original main load-bearing structure, will be retained. The three-nave, riveted steel structure dates from 1924 and continues to form part of the building. During the first phase of construction, the northern end block was refurbished and converted into the city archive. During the second construction phase, new office and archive spaces were created. This is now followed by the construction of a new innovation centre for companies in the biotechnology sector.
Construction pit for the third construction phase
For the new building, the construction pit is being dug in sections to a depth of up to 4.8 metres. Large sections are being excavated with sloping sides. In some areas, a braced sheet pile wall is also being used. This provides support for areas where structural elements extend beyond the building line of the new development. The excavation work forms the basis for the subsequent structural work on the innovation centre.
DSV underpinning for the historic building
A key task of the specialised civil engineering work was to secure and underpin the listed existing structures. Along the portico, approximately 1,400 m³ of shotcrete was applied. This forms the basis for the underpinning of the existing structural areas. In addition, steel bracing and a total of 35 strand anchors were used. In sections where anchoring was not possible, load transfer was ensured via an additional bracing structure.
Work between the new development and the listed structures
In addition to the portico areas, the historic individual foundations of the preserved steel frames were also incorporated into the construction work. The foundations were adapted using jet-grouting underpinning. The work was carried out in stages and was coordinated with the existing building structures as well as the requirements of the heritage protection authorities. Step by step, the connection between the historic structures and the new buildings within the site took shape.
The foundation for the Innovation Centre
Even before the new buildings become visible, construction pits, underpinning works and foundation elements for the next construction phases are being created beneath the surface. The completion of the construction pit stabilisation and the DSV underpinning works laid the groundwork for the further development of Exhibition Hall 12. Thus, a further section of the Alte Messe Leipzig is taking shape, bridging the gap between historic industrial heritage and new uses.