Foundations

Combined Heat and Power Plant Modernisation

Stuttgart, Germany / 02.2017 - 04.2017

For over 60 years, electricity and heat for the region has been produced at the Stuttgart-Gaisburg combined heat and power plant (CHP). So that in the future heat can be generated in a more environmentally friendly and efficient way, the CHP will be modernised from the ground up. The primarily coal-fuelled CHP will be replaced by a much smaller, efficient and lower-emissions gas heating plant.

FRANKI was commissioned with the foundation using FRANKIPILE NG® and performed the in-situ concrete and steel tube piles. One of the specifications was to remain above the existing gipskeupers. Additionally, dust minimisation presented an important topic. The CHP should be put into operation at the end of 2018.

Facts & Figures


Company

Type

Foundations

Runtime

02.2017 - 04.2017

Principal
Stuttgart-Gaisburg combined heat and power plant

Modernisation methods at the Stuttgart-Gaisburg Combined Heat and Power Plant

Services:

527 FRANKIPILE NGR,

d = 61 cm,

Nk ≤ 2,150 kN, L ≤ 8 m

32 FRANKIPILE NGR,

d = 42 cm, Nk ≤ 550 kN

L ≤ 8 m

10 Steel tube piles,

d = 41 cm, Nk ≤ 300 kN,

L ≤ 8 m

What ultimately counts in the construction business is successfully completed projects. PORR has many of these.