Bridge construction

New construction of the Carl-Ulrich Bridge

Offenbach, Germany / 10.2012 - 11.2015

PORR was awarded the contract for the planning, demolition and replacement of the inner-city Carl Ulrich Bridge between Frankfurt and Offenbach across the River Main. The existing composite bridge was no longer stable and had a limited service life. The river areas were demolished by a floating crane, the foreland areas were demolished in parallel by a truck-mounted crane. The entire steel construction (without roadway slab) had a weight of approx. 770t. The sections in the river area were excavated together with the roadway slab and each weighed approx. 230t. The demolition was carried out according to a concept specially developed by PORR.

As a replacement, a three-span composite steel bridge was erected on the same site from a single cell box girder cross-section with a parabolically convex lower edge and solid reinforced concrete pillars. By increasing the maximum span for the central opening from currently 41m to 112m, relief was achieved for shipping on the Main.

The new bridge was built in confined spaces. With the exception of a four-week total closure, public road traffic could be maintained.

Facts & Figures


Company

PORR GmbH & Co. KGaA

Type

Bridge construction

Runtime

10.2012 - 11.2015

Principal
DEGES Deutsche Einheit Fernstraßenplanungs- u. bau GmbH

New bridge connects Frankfurt and Offenbach.

Technical data

  • Bridge class: 60/30
  • Length: 61.4/112/61.4m, total: 234.8m
  • Sections: 3 sections, continuous beam
  • Cross-section: Single-cell composite cross-section
  • Roadway width: 8.00 m pedestrian/bicycle paths: 2 x 3.00m
  • Overall width: 14.00m
  • Construction height: 3.05m (abutment), 5.05m (pillar)
  • Standard assembly: ZTV-ING Part 7
  • Asphalt: 7.5cm mastic asphalt
  • Bearing: spherical plain bearings on the pillars and abutments
  • Forming surface: approx. 3.400m²
  • Construction steel: 1.400t
  • Reinforcing steel: 860t
  • Construction concrete: 4,800m³
  • Bridge area: 3,273m²

What ultimately counts in the construction business is successfully completed projects. PORR has many of these.