Cut-off walls
Cut-off walls reliably seal construction pits and structures against groundwater. They are constructed using a single- or two-phase system, can serve temporary or permanent purposes, and, when combined with structural elements, can also provide structural support. Cut-off walls are regarded as a cost-effective, low-deformation and low-noise solution for construction pits, dams, landfills and the containment of contaminated sites.
Glossary: Cut-off walls
Cut-off wallsin accordance with DIN EN 1538
The cut-off walls are constructed using both single-phase and two-phase systems. They serve to provide waterproofing and/or shielding and can be used for temporary or permanent applications.
In conjunction with installed load-bearing elements, cut-off walls can also provide structural support and, depending on the project, be used as a shoring solution for construction pits.
To seal construction pits horizontally against groundwater, cut-off walls are integrated into existing soil layers with low water permeability or into artificially constructed sealing slabs.
Areas of application include:
- Construction pit shoring with installed load-bearing elements
- Transverse bulkheads for subdividing large construction pits
- Dam sealing
- Landfill enclosures
- Enclosures for contaminated sites on industrial brownfield sites and similar locations
Technical brochureConstruction pits
Benefits / Featuresof cut-off walls
- Waterproofing: Cut-off walls can be used to provide a waterproof barrier against groundwater.
- Deformation behaviour: In combination with load-bearing elements and back anchors, minimal deformation can be achieved.
- Shoring function: It is possible to separate the structural and waterproofing functions.
- Construction depth: Construction using the grab method is possible at depths of approximately 20 to 40 m.
- Construction process: The shorter runtime compared to bored pile walls saves both time and money.
- Surface finish: Smooth surfaces can offer benefits for subsequent work stages.
- Construction: Low-noise construction with minimal vibrations is possible.
- Application conditions: Can also be used where headroom is limited (e.g. under bridges).
Basic facts
Design variantsCut-off wall
The following variants are available:
- Cut-off wall with sheet-pile wall
- Cut-off wall with prefabricated concrete elements
- Cut-off wall with HEB profiles
- Cut-off wall without load-bearing elements, for sealing purposes only

Quality assurance Cut-off walls
Cut-off walls are constructed in accordance with the applicable standards, technical regulations as well as project-specific requirements.
Principles of construction:
- Project-specific procedural instructions
- Requirements in accordance with DIN EN 1538
- Verification of the position, rotation and verticality of the slotted lamellae using modern measurement technology such as inclinometers
- Quality management system in accordance with DIN EN ISO 9001:2015